    What’s Proposed for Our School

  • Proposition B
    Proposition B: School Renovations & Safety

    • Safety & Security Upgrades
    • Minor Renovations, Building D
      • Restrooms
      • Painting 
      • Flooring 
      • Electrical, Fire Safety and HVAC Updates
    • 2 Additional Gyms
    • Locker Room Major Renovation
    • Tennis Court Relocation & Replacement / Storage & Restroom Addition
    • Baseball & Softball Locker Rooms / Coaches Office / Dugout Extensions
    • Auxiliary Field LED Lights
    • Updated Campus SAC
    • 8’ Fence around Track & Field, with gates
    • Softball: Covered Hitting Tunnel 
    • Dropdown Batting Tunnel for SAC
    • Turf Replacement for Softball and Baseball
    • Update SAC

    Proposition C
    Proposition C: Instructional Technology

    • Classroom Multimedia AV
    • End User Technology Replacements
    • Enterprise Systems/Applications
    • Learning Media Services
Academy High School front entrance
Plano East opened Phase I of its construction in 1981 at a cost of $14.2 million. The building, situated on 123 acres, was created to resemble a college campus. An additional 82,200 square feet of land was added to the school in 1983.

  • Additional Propositions

    Additional projects are proposed that would accommodate student programs and activities for multiple grade levels.

    Visit the web pages to view what’s proposed for Proposition D (Event Center) and Proposition E (Safety & Maintenance at Stadiums).

    Prop D

    Prop E