• Sigler Elementary School

    What’s Proposed for Our School

  • Proposition B
    Proposition B: School Renovations & Safety

    • Safety and Security Updates
    • Fire Safety Updates
      • Sprinkler System
    • Playground Surface Replacement
    • New Playground Equipment
    • Playground Shade Structure
    • HVAC Lifecycle Replacement
      • HVAC Controls
      • Roof Top Unit
    • Digital Marquee

    Proposition C
    Proposition C: Instructional Technology

    • Classroom Multimedia AV
    • End User Technology Replacements
    • Enterprise System/Applications
    • Learning Media Services
Sigler Elementary School Facade
Sigler Elementary School opened in 1964 with additions in 1970 and 1992. The school opened for the 2009-10 school year with a new, replacement building funded by the 2004 bond.

  • Additional Propositions

    Additional projects are proposed that would accommodate student programs and activities for multiple grade levels.

    Visit the web pages to view what’s proposed for Proposition D (Event Center) and Proposition E (Safety & Maintenance at Stadiums).

    Prop D

    Prop E